Opening drives

Slimchain * Chain drive in an attractive design with numerous possible applications in 24 V version

Slimchain Chain drive in attractive design with numerous possible applications
  • Can be integrated perfectly into the façade design thanks to its slim and discreet look
  • Continuously adjustable drive stroke and individual speeds for ventilation and smoke and heat extraction
  • Available as special version - stroke, cable length, colour and alignment configurable to left hand/right hand door
  • Synchronisation of max. four drives without external control unit
  • DIP switches for changing the mode of operation (Solo and Syncro, master, slave)
  • Fast and easy installation with the Smart fix installation system
  • IQ windowdrive - intelligent drive control
  • Tested as a natural smoke and heat exhaust ventilation device (SHEV) in accordance with EN 12101-2
Contact us

Application Areas

  • Smoke and heat extraction system and natural ventilation (24 V) in the façade area
  • Can be used in exhaust air and air inlet systems
  • Inward- and outward-opening windows with bottom-hung, top-hung and side-hung leaves
  • Projected top hung and parallel opening windows
  • Installation on wooden, PVC or metal windows
  • Leaf, frame or integrated installation
  • System solution in combination with the Power lock locking drive

Technical data

Slimchain
Length Stroke 300: 560 mm, stroke 500: 660 mm, stroke 800: 810 mm (each with brackets)
Dimensions Length x 25 x 44 mm
Space needed on frame (min.) Frame installation inward-opening: 40 mm, leaf installation inward-opening: 16/21 mm, frame installation outward-opening: 31 mm
Space requirement on leaf (min.) Frame installation inward-opening: 40 mm, leaf installation inward-opening: 34/29 mm, frame installation outward-opening: 19 mm
Opening speed RWA 15 mm/s
Opening speed ventilation 5 mm/s
Closing speed (max.) 5 mm/s
Force of pressure (max.) 100 N (depending on stroke), see force-path chart
Locking force (max.) 2000 N
Tensile force 300 N
Leaf weight 200 kg*
Overlap area 0 - 23 mm (depending on the application and bracket set)
Voltage at operation 24 V ± 25 %
Operating voltage 24 V DC
Current consumption 1.1 A
Current consumption according to area of application Ventilation (24 V): 0.9 A; RWA (18 V): 1.1 A
Power consumption 22 W
Performance when off 0 W
Performance in standby mode 0.3 W
Performance in a networked on-call system 0.4 W
Time to switch to Off/Standby mode (min) 0 min
Duty rating 30 %
Special length of connector cable 5 m. 7.5 m
Min. core cross section 0.75 mm²
Number of cores 4 cores
Service temperature -5 - 70 °C
IP rating IP40
protection rating III
Syncro function Yes
Adjustable opening speed (ventilation) Yes
Additional locking available Yes
Type of additional locking mechanism Locking drive
Type of stroke shortening Synchronising unit, Factory setting
End position cut-off extended electronic, via internal path sensor
End position cut-off retracted electronically via current consumption
Overload cut-off Yes
Complete opening within 60 s yes, including locking drive
NSHEV tested Yes
NSHEV additional information yes, including locking drive
Number synchronisation drive units 4
KNX ability Yes
Bottom-hung window INWARD-opening frame installation Yes
Bottom-hung window inward opening leaf installation Yes
Bottom-hung window OUTWARD-opening frame installation Yes
Side-hung window INWARD-opening frame installation Yes
Side-hung window INWARD-opening door leaf installation Yes
Side-hung window OUTWARD-opening frame installation Yes
Top-hung window INWARD-opening frame installation Yes
Top-hung window OUTWARD-opening frame installation Yes
Projected top-hung window OUTWARD-opening frame installation Yes
Parallel-opening window OUTWARD-opening frame installation Yes

Downloads

Product shot

Installation situation

Product data sheet

User manual

Installation instructions

Wiring diagram

Supplementary sheet

Declaration of incorporation

Declaration of conformity

Tender texts

Flyer/folder

Product brochure

Environmental declaration

Installation drawing

Variants & Accessories

Contact

GEZE Central +39-039-9530-401 GEZE Service +39-039-9530-456